3D Printed School in Pune – Built in Just 25 Days

Date: Aug 2025
Location: Pune, Maharashtra
Built Area: 3600 sqft
Construction Time: 25 days
Technology Used: On-Site Gantry 3D Concrete Printer

Cretebots has successfully completed a 3600 sqft 3D Printed School in Pune, becoming one of India’s fastest executed 3D-printed educational buildings.

The entire structure was printed directly at the construction site using our advanced on-site gantry 3D concrete printer, allowing the full project to be completed within just 25 days. Designed for a rural community, this project focuses on creating a safe, modern, durable, and inspiring learning environment for children.

Design & Construction Details

Located in a rural region of Pune, the school has been developed with a clear vision—providing accessible, modern, and high-quality infrastructure for students.

Spread across 3600 sqft, the layout features:

  • Naturally ventilated classrooms

  • Ample daylight to reduce energy usage

  • Strong, durable wall structures

  • Smooth interior environment for effective learning

  • Sustainable architectural elements

The project overcomes challenging site conditions through the speed, precision, and efficiency of Cretebots’ 3D printing technology. The dry-mix concrete used in printing offers high strength, long-lasting durability, and weather resistance.

Technical Specifications

ParameterDetails
Project Type3D Printed School
LocationPune, Maharashtra
Built-Up Area3600 sqft
Construction Duration25 Days
Printer UsedOn-site Gantry 3D Concrete Printer
MaterialHigh-strength dry mix
Sustainability FeaturesNatural ventilation, daylight optimization
PurposePrimary school building for rural community
3D concrete printer
3D concrete printer
3D concrete printer
3D concrete printer

Why This Project Is Unique

  • India’s fastest 3D printed school building

  • Printed directly at the site — no shuttering, no molds

  • Very low labor requirement

  • High precision, consistent quality

  • Weather-resistant structure suitable for long-term use

  • Eco-friendly and cost-effective

  • Designed to empower rural education

This is not just a building — it is a step towards reimagining educational infrastructure in underserved regions, where innovation meets social impact.

Project Impact

  • Faster infrastructure delivery for rural communities

  • Improved learning environment for young students

  • Demonstrates the future of affordable, scalable 3D printed construction in India

  • Sets a benchmark for the use of technology in public infrastructure projects

The entire construction was completed in just 25 days.

Cretebots’ on-site gantry 3D concrete printer was used to print the walls and main structure.

Yes. The dry mix used provides high strength, structural stability, and long-term durability.

The total built-up area is 3600 sqft.

Yes — it reduces time, labor, shuttering cost, material waste, and ensures high precision.

Latest from Our Projects
WhatsApp