
Jan 2026
Area: 640 sqft
Time taken: 4 days
Located in Dholera, this 640 sq ft 3D-printed site office was developed to support on-ground project operations with speed and efficiency. The structure is designed to be functional, compact, and modern, making it ideal for site management in developing zones.
Built using our onsite gantry 3D printing technology, the construction process was fast, accurate, and resource-efficient. The system ensured consistent quality with minimal manual intervention, while also reducing material wastage through optimized printing techniques.
The project was completed in just 4 days, demonstrating how 3D printing can significantly cut down construction timelines without compromising durability. This site office stands as a practical example of next-generation construction, delivering quick, reliable, and scalable solutions for infrastructure development.
This 640 sq ft 3D printed site office in Dholera was constructed using Cretebots’ on-site gantry 3D printer in just 4 days. Designed for fast deployment and on-site efficiency, the structure features robust walls, optimized layout, and durable dry-mix concrete, making it ideal for active construction environments and project management needs.
| Parameter | Details |
|---|---|
| Location | Dholera Gujrat |
| Area | 640 sqft |
| Construction Time | 4 Days |
| Printer Used | On-site Gantry 3D Concrete Printer |
| Material | High-strength Sustainable Dry Mix |
| Design Feature | Curved form + Wind-resistant |
| Use Case | Short-term rental cottages |
The site office has a total built-up area of 640 sq ft, designed for efficient space utilization.
Each cottage measures 350–400 sqft.
The project was built using Cretebots’ on-site gantry 3D printer, enabling fast and precise construction.
Yes, the structure is built with high-strength dry-mix concrete, ensuring durability and long-term performance.