

Date: Aug 2025
Location: Pune, Maharashtra
Built Area: 3600 sqft
Construction Time: 25 days
Technology Used: On-Site Gantry 3D Concrete Printer
Cretebots has successfully completed a 3600 sqft 3D Printed School in Pune, becoming one of India’s fastest executed 3D-printed educational buildings.
The entire structure was printed directly at the construction site using our advanced on-site gantry 3D concrete printer, allowing the full project to be completed within just 25 days. Designed for a rural community, this project focuses on creating a safe, modern, durable, and inspiring learning environment for children.
Located in a rural region of Pune, the school has been developed with a clear vision—providing accessible, modern, and high-quality infrastructure for students.
Spread across 3600 sqft, the layout features:
Naturally ventilated classrooms
Ample daylight to reduce energy usage
Strong, durable wall structures
Smooth interior environment for effective learning
Sustainable architectural elements
The project overcomes challenging site conditions through the speed, precision, and efficiency of Cretebots’ 3D printing technology. The dry-mix concrete used in printing offers high strength, long-lasting durability, and weather resistance.
| Parameter | Details |
|---|---|
| Project Type | 3D Printed School |
| Location | Pune, Maharashtra |
| Built-Up Area | 3600 sqft |
| Construction Duration | 25 Days |
| Printer Used | On-site Gantry 3D Concrete Printer |
| Material | High-strength dry mix |
| Sustainability Features | Natural ventilation, daylight optimization |
| Purpose | Primary school building for rural community |
India’s fastest 3D printed school building
Printed directly at the site — no shuttering, no molds
Very low labor requirement
High precision, consistent quality
Weather-resistant structure suitable for long-term use
Eco-friendly and cost-effective
Designed to empower rural education
This is not just a building — it is a step towards reimagining educational infrastructure in underserved regions, where innovation meets social impact.
Faster infrastructure delivery for rural communities
Improved learning environment for young students
Demonstrates the future of affordable, scalable 3D printed construction in India
Sets a benchmark for the use of technology in public infrastructure projects
The entire construction was completed in just 25 days.
Cretebots’ on-site gantry 3D concrete printer was used to print the walls and main structure.
Yes. The dry mix used provides high strength, structural stability, and long-term durability.
The total built-up area is 3600 sqft.
Yes — it reduces time, labor, shuttering cost, material waste, and ensures high precision.